This project is different from the previous overhaul project,Due to the small demand for market orders and the upcoming expiration of workshop leases, there are many reasons.,After Tian Zong communicated with Xiao Yang Lan Zong,give solutions,Change the main melting method from the original flat plug electrode to the top plug electrode.,All pool walls are tiled.

This project7.3Arrive in Guangdong,7.6Japan officially starts,7.25Daily night shift discharging,Site construction personnel in total7People go through20Day,Completion of construction.

In order to ensure that after the completion of the construction,Manufacturers can resume production in the shortest possible time,The whole construction kiln is in the state of heat preservation,Power failure during construction,Power transmission and thermal insulation after completion of construction on the same day,The continuity of construction cannot be guaranteed to a certain extent,The construction period coincides with the hottest month in Zhongshan,The sun is hot outside,The average temperature inside the workshop is40-50?C,Higher temperature around the furnace,Average daily consumption1Box of Huoxiang Zhengqi Water.

Communicate the construction plan and required materials with the manufacturer in advance before construction.,Due to the change of the top insertion electrode, part of the breast wall needs to be removed.,In order to prevent the breast wall and crown collapse,Use3Days or so of time,Reinforce the crown and breast wall and remove the space required for the top insertion electrode.

During construction,In the process of removing the external clay brick of the pool wall,It was found that some of the pool wall bricks had been seriously eroded.,In order to prevent the glass liquid from flowing out,When removing external clay bricks,Brick removal on one side,Cooling while watering.Due to the high temperature at the pool wall,On-site personnel rotation,prevent heatstroke.This electric stove is my company2023The 30th electric furnace successfully put into operation in the year.

On-site demolition of pool wall clay bricks

 

Check the pool wall erosion

 

Site photos after completion of construction