Taixing a company 1 ton soda lime glass electric melting furnace overhaul smoothly put into operation
+
  • Taixing a company 1 ton soda lime glass electric melting furnace overhaul smoothly put into operation

Taixing a company 1 ton soda lime glass electric melting furnace overhaul smoothly put into operation

Classification:

Engineering case

Keywords:


A 1-ton soda-lime glass electric melting furnace overhauled by our company for a company in Taixing was successfully powered on February 18, 2023 and delivered on time on February 28. This is the 10th electric melting furnace successfully put into operation in 2023, and the material quality reaches the normal production standard.

This project is the third electric furnace built by our company for the customer, which is overhauled and installed on the original basis. This overhaul, because the domestic epidemic has just been released, some refractory materials have been purchased for a long time, and at the same time, they are in urgent need of on-site construction after the year. The time left for our design, procurement and construction is very urgent and the task is heavy. According to the time when the materials enter the site, the construction personnel adjust the site construction time and reasonably arrange the personnel. While ensuring the construction quality and progress, the construction personnel will be put into production smoothly at the production time required by the customer according to the agreement, thus fundamentally ensuring the interests of the customer.