Foshan Chuandong Phase I Second Overhaul Successfully Put into Production
+
  • Foshan Chuandong Phase I Second Overhaul Successfully Put into Production

Foshan Chuandong Phase I Second Overhaul Successfully Put into Production

Classification:

Engineering case

Keywords:


Foshan Chuandong Phase I1Tons of sodium calcium lighting furnace second overhaul in2017Year3Month9Sunrise material, the customer will arrange production immediately after discharging, and the material quality will basically meet the customer's product requirements.

This time, the customer is very satisfied with the installation quality and installation and debugging personnel of our company, but it is proposed that the structure of the working pool is not ideal, and the glass liquid level of the working pool drops3When the temperature drops seriously, causing production difficulties and affecting material quality, the customer proposes to change the working pool space.