Power plant fly ash electric melting test furnace first battle victory
+
  • Power plant fly ash electric melting test furnace first battle victory

Power plant fly ash electric melting test furnace first battle victory

Classification:

Engineering case

Keywords:


Fly ash is the residue collected from the flue gas purification system of waste incineration power plant, which contains heavy metals, benzene and other pollutants, and is a hazardous waste.30% for potassium, sodium, chloride ions and other harmful salt calcination,70% isCalcium, silicon, aluminum, iron and other components, the melting process will produce a lot of water.

FromSince the end of 2017, the cooperative fly ash electric melting treatment test project has been contracted. Through two cooperation with customers, the first battle has been won. The test furnace has realized the drainage and discharge of nitro water and the melting of cold top, which has been recognized by customers. A third test is planned in the near future for further data collection for subsequent large furnaces.