Another milky white electric furnace was put into operation smoothly.
+
  • Another milky white electric furnace was put into operation smoothly.

Another milky white electric furnace was put into operation smoothly.

Classification:

Engineering case

Keywords:


My company isJiangsu Yuefeng Group overhauledA Nissan40tonsmilky whiteglass electric melting furnace(3#Furnace), in2019Year9Month1Daily ignition, after discharge3The material quality reached the normal production standard in days. The time required by the manufacturer for the overhaul of this furnace is very tight. The construction personnel of our company installed it in two shifts and only used it.6The installation was completed in days and the fire was lit according to the manufacturer's requirements, which was highly recognized by the manufacturer..